{"id":915,"date":"2025-03-06T13:58:02","date_gmt":"2025-03-06T13:58:02","guid":{"rendered":"https:\/\/wldevhost.ir\/psa2025\/?page_id=915"},"modified":"2025-12-14T10:04:39","modified_gmt":"2025-12-14T06:34:39","slug":"projects","status":"publish","type":"page","link":"https:\/\/petrosadr.com\/en\/projects\/","title":{"rendered":"Projects"},"content":{"rendered":"\n<div class=\"wp-block-group has-ast-global-color-4-color has-ast-global-color-1-background-color has-text-color has-background has-link-color wp-elements-01e162a402e4ca3d62b1d21109c31605 is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\"><strong>PetroSadr Company<\/strong>, with its extensive experience in executing numerous projects in the <strong>oil, gas, petrochemical, and water sectors<\/strong>, has always been recognized as a <strong>reliable partner in the energy industry<\/strong>.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">\n<h3 class=\"wp-block-heading\">Infrastructure<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Successful projects over the past 20 years in the oil, gas, petrochemical, and water industries:<\/p>\n\n\n\n<table id=\"tablepress-2\" class=\"tablepress tablepress-id-2\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">#<\/th><th class=\"column-2\">Client<\/th><th class=\"column-3\">Subject of Purchase<\/th><th class=\"column-4\">Standard<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">1<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 191,687 meters of 56-inch pipe<\/td><td class=\"column-4\">API 5L GR X70<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">2<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 84,500 meters of 56-inch pipe<\/td><td class=\"column-4\">API 5L GR X70<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">3<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 75,400 meters of 42-inch pipe<\/td><td class=\"column-4\">API 5L GR X65<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">4<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 84,600 meters of 42-inch pipes in seven thicknesses with EBF coating<\/td><td class=\"column-4\">API 5L GR X65<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">5<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 23,440 meters of 36-inch pipe<\/td><td class=\"column-4\">API 5L GR X65<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">6<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 320,325 meters of 20 and 24-inch pipes (13 items of ERW steel pipe)<\/td><td class=\"column-4\">API 5L GR X60<\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">7<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 126,732 meters of 12-inch pipes<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">8<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 30,400 meters of 12-inch pipe<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">9<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 208,221 meters of 10 and 16-inch pipes<\/td><td class=\"column-4\">API 5L GR X42, API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">10<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 33,924 meters of 20-inch pipe<\/td><td class=\"column-4\">API 5L GR X60<\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">11<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 38,000 meters of 10-inch pipe<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">12<\/td><td class=\"column-2\">Iran Gas Engineering and Development Company<\/td><td class=\"column-3\">Purchase of 20,824 meters of 8-inch pipe<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">13<\/td><td class=\"column-2\">National Iranian Oil Engineering and Construction Company<\/td><td class=\"column-3\">Purchase of 231,564 meters of 16-inch pipe in 6 thicknesses with EBF and VU itnA coating<\/td><td class=\"column-4\">API 5L GR X60<\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">14<\/td><td class=\"column-2\">National Iranian Oil Engineering and Construction Company<\/td><td class=\"column-3\">Purchase of 33,000 meters of 8-inch pipe with three-layer coating<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">15<\/td><td class=\"column-2\">National Iranian Oil Engineering and Construction Company<\/td><td class=\"column-3\">Purchase of 37.370 kilometers of 8-inch pipe with polyethylene coating<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\">16<\/td><td class=\"column-2\">National Iranian Oil Engineering and Construction Company<\/td><td class=\"column-3\">Purchase of 11 kilometers of 20-inch pipe with a thickness of 0.375 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-18\">\n\t<td class=\"column-1\">17<\/td><td class=\"column-2\">National Iranian Oil Engineering and Construction Company<\/td><td class=\"column-3\">Purchase of 6,500 meters of 16-inch pipe<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-19\">\n\t<td class=\"column-1\">18<\/td><td class=\"column-2\">Iranian Oil Pipeline and Telecommunications Company<\/td><td class=\"column-3\">Purchase of 19,100 meters of 32-inch pipe with thicknesses of 0.344, 0.375, and 0.406 inches<\/td><td class=\"column-4\">API 5L GR X60<\/td>\n<\/tr>\n<tr class=\"row-20\">\n\t<td class=\"column-1\">19<\/td><td class=\"column-2\">Iranian Oil Pipeline and Telecommunications Company<\/td><td class=\"column-3\">Purchase of 25,000 meters of 20-inch pipe with thicknesses of 0.281 and 0.406 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-21\">\n\t<td class=\"column-1\">20<\/td><td class=\"column-2\">Iranian Oil Pipeline and Telecommunications Company<\/td><td class=\"column-3\">Purchase of 18,000 meters of 16-inch pipe with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-22\">\n\t<td class=\"column-1\">21<\/td><td class=\"column-2\">Iranian Oil Pipeline and Telecommunications Company<\/td><td class=\"column-3\">Purchase of 10,000 meters of 8-inch pipe with thicknesses of 0.219 and 0.250 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-23\">\n\t<td class=\"column-1\">22<\/td><td class=\"column-2\">Iranian Oil Pipeline and Telecommunications Company<\/td><td class=\"column-3\">Purchase of 18,000 meters of 6, 8, 10, and 12-inch pipes<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-24\">\n\t<td class=\"column-1\">23<\/td><td class=\"column-2\">National Iranian South Oil Company<\/td><td class=\"column-3\">Purchase of 35 seamless 8-inch pipe joints<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-25\">\n\t<td class=\"column-1\">24<\/td><td class=\"column-2\">National Iranian South Oil Company<\/td><td class=\"column-3\">Purchase of 2,000 seamless tubing joints<\/td><td class=\"column-4\">API 5CT GR L-80-1<\/td>\n<\/tr>\n<tr class=\"row-26\">\n\t<td class=\"column-1\">25<\/td><td class=\"column-2\">National Iranian South Oil Company<\/td><td class=\"column-3\">Purchase of 6,000 meters of 12-inch seamless pipe in two items for sour service ECAN use<\/td><td class=\"column-4\">API 5L GR B, API 5L GR X60<\/td>\n<\/tr>\n<tr class=\"row-27\">\n\t<td class=\"column-1\">26<\/td><td class=\"column-2\">National Iranian South Oil Company<\/td><td class=\"column-3\">Purchase of 3,121 meters of 14-inch seamless pipe and 6,000 meters of 6 and 8-inch welded pipe<\/td><td class=\"column-4\">API 5L GR B, API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-28\">\n\t<td class=\"column-1\">27<\/td><td class=\"column-2\">Omran Idea Energy Development Company<\/td><td class=\"column-3\">Purchase of 27,504 meters of 6\" pipe with a thickness of 0.312 inches ECAN (Employer: South Oilfields)<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-29\">\n\t<td class=\"column-1\">28<\/td><td class=\"column-2\">Omran Idea Energy Development Company<\/td><td class=\"column-3\">Purchase of 22,704 meters of 6\" pipe with a thickness of 0.312 inches (Employer: South Oilfields)<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-30\">\n\t<td class=\"column-1\">29<\/td><td class=\"column-2\">North Drilling Company<\/td><td class=\"column-3\">Purchase of 100,000 meters of 6-inch pipe with a thickness of 0.280 inches ECAN<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-31\">\n\t<td class=\"column-1\">30<\/td><td class=\"column-2\">North Drilling Company<\/td><td class=\"column-3\">Purchase of 34,010 meters of 6-inch pipe with a thickness of 0.280 inches ECAN<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-32\">\n\t<td class=\"column-1\">31<\/td><td class=\"column-2\">North Drilling Company<\/td><td class=\"column-3\">Two items of evlaV<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-33\">\n\t<td class=\"column-1\">32<\/td><td class=\"column-2\">North Drilling Company<\/td><td class=\"column-3\">Pipe for dlofinaM ekohC<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-34\">\n\t<td class=\"column-1\">33<\/td><td class=\"column-2\">North Drilling Company<\/td><td class=\"column-3\">Pipe for dlofinaM ekohC rof woblE<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-35\">\n\t<td class=\"column-1\">34<\/td><td class=\"column-2\">North Drilling Company<\/td><td class=\"column-3\">Pipe for kcatS poB<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-36\">\n\t<td class=\"column-1\">35<\/td><td class=\"column-2\">National Iranian Oil Company - Exploration Management<\/td><td class=\"column-3\">Purchase of 6,000 meters of 7-inch seamless casing pipe<\/td><td class=\"column-4\">API 5CT GR C-110<\/td>\n<\/tr>\n<tr class=\"row-37\">\n\t<td class=\"column-1\">36<\/td><td class=\"column-2\">Aghajari Oil and Gas Operating Company<\/td><td class=\"column-3\">Purchase of 1,150 joints of 6 and 16-inch pipe ECAN<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-38\">\n\t<td class=\"column-1\">37<\/td><td class=\"column-2\">Aghajari Oil and Gas Operating Company<\/td><td class=\"column-3\">Purchase of 10-inch water pipe<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-39\">\n\t<td class=\"column-1\">38<\/td><td class=\"column-2\">Marun Oil and Gas Operating Company<\/td><td class=\"column-3\">Purchase of 3,000 joints of 6-inch pipe ECAN<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-40\">\n\t<td class=\"column-1\">39<\/td><td class=\"column-2\">Marun Oil and Gas Operating Company<\/td><td class=\"column-3\">Purchase of 2,000 joints of 8-inch pipe ECAN<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-41\">\n\t<td class=\"column-1\">40<\/td><td class=\"column-2\">Gachsaran Oil and Gas Operating Company<\/td><td class=\"column-3\">Purchase of 1,552 meters of 28-inch pipe ECAN<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-42\">\n\t<td class=\"column-1\">41<\/td><td class=\"column-2\">South Zagros Oil and Gas Production Company<\/td><td class=\"column-3\">Purchase of 1,883 joints of 4-inch pipe with a thickness of 6 millimeters<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-43\">\n\t<td class=\"column-1\">42<\/td><td class=\"column-2\">South Zagros Oil and Gas Production Company<\/td><td class=\"column-3\">Purchase of various types of pipes<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-44\">\n\t<td class=\"column-1\">43<\/td><td class=\"column-2\">West Oil and Gas Production Company<\/td><td class=\"column-3\">Purchase of 480 meters of 12-inch pipe<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-45\">\n\t<td class=\"column-1\">44<\/td><td class=\"column-2\">National Iranian Drilling Company<\/td><td class=\"column-3\">Purchase of 700 meters of 8-inch seamless pipe with a thickness of 0.500 inches<\/td><td class=\"column-4\">API 5L GR A<\/td>\n<\/tr>\n<tr class=\"row-46\">\n\t<td class=\"column-1\">45<\/td><td class=\"column-2\">Iranian Offshore Oil Company<\/td><td class=\"column-3\">Purchase of 30-inch conductor pipe<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-47\">\n\t<td class=\"column-1\">46<\/td><td class=\"column-2\">Iranian Offshore Oil Company<\/td><td class=\"column-3\">Purchase of 6,000 meters of 20-inch seamless casing pipe<\/td><td class=\"column-4\">API 5CT GR K-55<\/td>\n<\/tr>\n<tr class=\"row-48\">\n\t<td class=\"column-1\">47<\/td><td class=\"column-2\">Tehran Oil Supply and Services Company<\/td><td class=\"column-3\">Purchase of 19 items of pipe<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-49\">\n\t<td class=\"column-1\">48<\/td><td class=\"column-2\">Tehran Oil Supply and Services Company<\/td><td class=\"column-3\">Purchase of seamless steel pipe in various thicknesses<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-50\">\n\t<td class=\"column-1\">49<\/td><td class=\"column-2\">Central Iranian Oil Fields Company<\/td><td class=\"column-3\">Purchase of 110,000 meters of water pipe<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-51\">\n\t<td class=\"column-1\">50<\/td><td class=\"column-2\">Central Iranian Oil Fields Company<\/td><td class=\"column-3\">Purchase of 4-inch water pipe<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-52\">\n\t<td class=\"column-1\">51<\/td><td class=\"column-2\">Central Iranian Oil Fields Company<\/td><td class=\"column-3\">Purchase of 45,000 meters of water pipe<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-53\">\n\t<td class=\"column-1\">52<\/td><td class=\"column-2\">Central Iranian Oil Fields Company<\/td><td class=\"column-3\">Purchase of 80,000 meters of water pipe<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-54\">\n\t<td class=\"column-1\">53<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 16,000 meters of 16-inch pipe with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-55\">\n\t<td class=\"column-1\">54<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,825 meters of 16-inch pipe with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-56\">\n\t<td class=\"column-1\">55<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 11,300 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-57\">\n\t<td class=\"column-1\">56<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 11,000 meters of 8-inch pipe with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-58\">\n\t<td class=\"column-1\">57<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 11,000 meters of 12-inch pipe with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-59\">\n\t<td class=\"column-1\">58<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 15,000 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-60\">\n\t<td class=\"column-1\">59<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 72,000 meters of 3\/4-inch pipe with a thickness of 0.113 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-61\">\n\t<td class=\"column-1\">60<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 8,000 meters of 2 and 4-inch pipes with thicknesses of 0.154 and 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-62\">\n\t<td class=\"column-1\">61<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 9,000 meters of 2 and 4-inch pipes with thicknesses of 0.154 and 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-63\">\n\t<td class=\"column-1\">62<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 51,000 meters of 4, 6, 10, 12, and 16-inch pipes<\/td><td class=\"column-4\">API 5L GR B, API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-64\">\n\t<td class=\"column-1\">63<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">(Ario Petro Soor Contractor) Purchase of 3,000 meters of 16-inch pipe, 0.312 thickness, Grade B<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-65\">\n\t<td class=\"column-1\">64<\/td><td class=\"column-2\">East Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 33,694 meters of 16-inch pipe with thicknesses of 0.250, 0.281, 0.344, and 0.406 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-66\">\n\t<td class=\"column-1\">65<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 45,000 meters of 8-inch pipe with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-67\">\n\t<td class=\"column-1\">66<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 30,000 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-68\">\n\t<td class=\"column-1\">67<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 110,000 meters of 3\/4-inch pipe with a thickness of 0.113 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-69\">\n\t<td class=\"column-1\">68<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 30,000 meters of 4-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-70\">\n\t<td class=\"column-1\">69<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 26,000 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-71\">\n\t<td class=\"column-1\">70<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 9,624 meters of 16-inch pipe with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-72\">\n\t<td class=\"column-1\">71<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 15,750 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-73\">\n\t<td class=\"column-1\">72<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 70,000 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-74\">\n\t<td class=\"column-1\">73<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 30,000 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-75\">\n\t<td class=\"column-1\">74<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 50,000 meters of 4-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-76\">\n\t<td class=\"column-1\">75<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 79,464 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-77\">\n\t<td class=\"column-1\">76<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 83,952 meters of 12-inch pipe with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-78\">\n\t<td class=\"column-1\">77<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 143,396 meters of 16-inch pipe with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-79\">\n\t<td class=\"column-1\">78<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">Purchase of 14,784 meters of 16-inch pipe with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-80\">\n\t<td class=\"column-1\">79<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">(Urom Sepehr Payam Engineering Contractor) Purchase of 6,660 meters of 12-inch pipe, 0.250 inch thickness<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-81\">\n\t<td class=\"column-1\">80<\/td><td class=\"column-2\">West Azerbaijan Province Gas Company<\/td><td class=\"column-3\">(Ario Petro Soor Contractor) Purchase of 45,000 meters of 8-inch pipe with a thickness of 0.188 inches, Grade B<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-82\">\n\t<td class=\"column-1\">81<\/td><td class=\"column-2\">Ardabil Province Gas Company<\/td><td class=\"column-3\">Purchase of 27,400 meters of 16-inch pipe with thicknesses of 0.250, 0.281, and 0.344 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-83\">\n\t<td class=\"column-1\">82<\/td><td class=\"column-2\">Ardabil Province Gas Company<\/td><td class=\"column-3\">Purchase of 2,985 meters of 12-inch pipe with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-84\">\n\t<td class=\"column-1\">83<\/td><td class=\"column-2\">Ardabil Province Gas Company<\/td><td class=\"column-3\">Purchase of 6,000 meters of 16-inch pipe with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-85\">\n\t<td class=\"column-1\">84<\/td><td class=\"column-2\">Ardabil Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,487 meters of 12-inch pipe with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-86\">\n\t<td class=\"column-1\">85<\/td><td class=\"column-2\">Ardabil Province Gas Company<\/td><td class=\"column-3\">(Pooshesh Karan Akhgar Contractor) Purchase of 8,000 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-87\">\n\t<td class=\"column-1\">86<\/td><td class=\"column-2\">Isfahan Province Gas Company<\/td><td class=\"column-3\">Purchase of 35,960 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-88\">\n\t<td class=\"column-1\">87<\/td><td class=\"column-2\">Isfahan Province Gas Company<\/td><td class=\"column-3\">Purchase of 38,452 meters of 2-inch pipe with a thickness of 0.154 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-89\">\n\t<td class=\"column-1\">88<\/td><td class=\"column-2\">Isfahan Province Gas Company<\/td><td class=\"column-3\">Purchase of 14,048 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-90\">\n\t<td class=\"column-1\">89<\/td><td class=\"column-2\">Isfahan Province Gas Company<\/td><td class=\"column-3\">Purchase of 4,008 meters of 10 and 12-inch pipes with thicknesses of 0.219 and 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-91\">\n\t<td class=\"column-1\">90<\/td><td class=\"column-2\">Alborz Province Gas Company<\/td><td class=\"column-3\">Purchase of 12,000 meters of 4-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-92\">\n\t<td class=\"column-1\">91<\/td><td class=\"column-2\">Alborz Province Gas Company<\/td><td class=\"column-3\">Purchase of 5,000 meters of 4-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-93\">\n\t<td class=\"column-1\">92<\/td><td class=\"column-2\">Alborz Province Gas Company<\/td><td class=\"column-3\">Purchase of 30,000 meters of 3\/4-inch pipe with a thickness of 0.113 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-94\">\n\t<td class=\"column-1\">93<\/td><td class=\"column-2\">Ilam Province Gas Company<\/td><td class=\"column-3\">Purchase of 65,004 meters of 8 and 10-inch pipes with thicknesses of 0.188 and 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-95\">\n\t<td class=\"column-1\">94<\/td><td class=\"column-2\">Ilam Province Gas Company<\/td><td class=\"column-3\">Purchase of 31,992 meters of 8 and 10-inch pipes with thicknesses of 0.188 and 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-96\">\n\t<td class=\"column-1\">95<\/td><td class=\"column-2\">Ilam Province Gas Company<\/td><td class=\"column-3\">Purchase of 30,000 meters of 12-inch pipe with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-97\">\n\t<td class=\"column-1\">96<\/td><td class=\"column-2\">Bushehr Province Gas Company<\/td><td class=\"column-3\">Purchase of 25,200 meters of 8-inch pipe with thicknesses of 0.188, 0.219, and 0.250 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-98\">\n\t<td class=\"column-1\">97<\/td><td class=\"column-2\">Tehran Province Gas Company<\/td><td class=\"column-3\">Purchase of 69,996 meters of 4-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-99\">\n\t<td class=\"column-1\">98<\/td><td class=\"column-2\">Tehran Province Gas Company<\/td><td class=\"column-3\">Purchase of 95,000 meters of 1 and 2-inch pipes with thicknesses of 0.133 and 0.154 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-100\">\n\t<td class=\"column-1\">99<\/td><td class=\"column-2\">Tehran Province Gas Company<\/td><td class=\"column-3\">Purchase of 130,000 meters of 4-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-101\">\n\t<td class=\"column-1\">100<\/td><td class=\"column-2\">Tehran Province Gas Company<\/td><td class=\"column-3\">Purchase of 40,000 meters of 8-inch pipe with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-102\">\n\t<td class=\"column-1\">101<\/td><td class=\"column-2\">Tehran Province Gas Company<\/td><td class=\"column-3\">Purchase of 100,000 meters of 3\/4-inch pipe with a thickness of 0.113 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-103\">\n\t<td class=\"column-1\">102<\/td><td class=\"column-2\">Tehran Province Gas Company<\/td><td class=\"column-3\">Purchase of 100,000 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-104\">\n\t<td class=\"column-1\">103<\/td><td class=\"column-2\">Tehran Province Gas Company<\/td><td class=\"column-3\">Purchase of 225,000 meters of 3\/4, 1, 2, and 4-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-105\">\n\t<td class=\"column-1\">104<\/td><td class=\"column-2\">Tehran Province Gas Company<\/td><td class=\"column-3\">Purchase of 123,000 meters of 3\/4, 1, and 4-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-106\">\n\t<td class=\"column-1\">105<\/td><td class=\"column-2\">Tehran Province Gas Company<\/td><td class=\"column-3\">Purchase of 18,000 meters of 10 and 12-inch pipes with thicknesses of 0.219 and 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-107\">\n\t<td class=\"column-1\">106<\/td><td class=\"column-2\">Tehran Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,600 meters of 16-inch pipe with a thickness of 0.344 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-108\">\n\t<td class=\"column-1\">107<\/td><td class=\"column-2\">Tehran Province Gas Company<\/td><td class=\"column-3\">Purchase of 37,500 meters of 3\/4-inch pipe with a thickness of 0.113 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-109\">\n\t<td class=\"column-1\">108<\/td><td class=\"column-2\">Chaharmahal and Bakhtiari Province Gas Company<\/td><td class=\"column-3\">Purchase of 10,008 meters of 8-inch pipe with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-110\">\n\t<td class=\"column-1\">109<\/td><td class=\"column-2\">Chaharmahal and Bakhtiari Province Gas Company<\/td><td class=\"column-3\">Purchase of 48,006 meters of 3\/4, 2, and 6-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-111\">\n\t<td class=\"column-1\">110<\/td><td class=\"column-2\">Chaharmahal and Bakhtiari Province Gas Company<\/td><td class=\"column-3\">Purchase of 12,050 meters of 8, 10, and 16-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-112\">\n\t<td class=\"column-1\">111<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 68,548 meters of 6 and 8-inch pipes with thicknesses of 0.172 and 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-113\">\n\t<td class=\"column-1\">112<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 20,400 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-114\">\n\t<td class=\"column-1\">113<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 14,700 meters of 8-inch pipe with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-115\">\n\t<td class=\"column-1\">114<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 10,000 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-116\">\n\t<td class=\"column-1\">115<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 15,300 meters of 8-inch pipe with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-117\">\n\t<td class=\"column-1\">116<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 15,000 meters of 8-inch pipe with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-118\">\n\t<td class=\"column-1\">117<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 21,000 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-119\">\n\t<td class=\"column-1\">118<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 32,000 meters of 4-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-120\">\n\t<td class=\"column-1\">119<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 16,200 meters of 4 and 8-inch pipes with thicknesses of 0.172 and 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-121\">\n\t<td class=\"column-1\">120<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 18,000 meters of 8-inch pipe with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-122\">\n\t<td class=\"column-1\">121<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 32,600 meters of 4 and 6-inch pipes with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-123\">\n\t<td class=\"column-1\">122<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 87,496 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-124\">\n\t<td class=\"column-1\">123<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 41,244 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-125\">\n\t<td class=\"column-1\">124<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">(Petro Gas Atieh Sazan Contractor) Purchase of 6,612 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-126\">\n\t<td class=\"column-1\">125<\/td><td class=\"column-2\">South Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 14,800 meters of 8-inch pipe with thicknesses of 0.250 and 0.344 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-127\">\n\t<td class=\"column-1\">126<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 38,000 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-128\">\n\t<td class=\"column-1\">127<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 14,016 meters of 16-inch pipe with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-129\">\n\t<td class=\"column-1\">128<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 50,000 meters of 3\/4-inch pipe with a thickness of 0.113 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-130\">\n\t<td class=\"column-1\">129<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 53,500 meters of 3\/4, 2, and 4-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-131\">\n\t<td class=\"column-1\">130<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 15,260 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-132\">\n\t<td class=\"column-1\">131<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 17,500 meters of 8-inch pipe with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-133\">\n\t<td class=\"column-1\">132<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 6,200 meters of 12-inch pipe with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-134\">\n\t<td class=\"column-1\">133<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 5,004 meters of 24-inch pipe with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-135\">\n\t<td class=\"column-1\">134<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">(Augusta Company Contractor) Purchase of 18,876 meters of 10-inch pipe with a thickness of 0.279 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-136\">\n\t<td class=\"column-1\">135<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">(Shiva Mashal Contractor) Purchase of 105,276 meters of 2, 4, 6, 8, and 10-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-137\">\n\t<td class=\"column-1\">136<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">(Yadak Gaz Sirc Contractor) Purchase of 4,188 meters of 20-inch pipe with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-138\">\n\t<td class=\"column-1\">137<\/td><td class=\"column-2\">Razavi Khorasan Province Gas Company<\/td><td class=\"column-3\">(Mashal Gostar Sepahan Contractor) Purchase of 4,188 meters of 20-inch pipe with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-139\">\n\t<td class=\"column-1\">138<\/td><td class=\"column-2\">North Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,356 meters of 6 and 8-inch pipes with thicknesses of 0.172 and 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-140\">\n\t<td class=\"column-1\">139<\/td><td class=\"column-2\">North Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 2,244 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-141\">\n\t<td class=\"column-1\">140<\/td><td class=\"column-2\">North Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 6,996 meters of 4-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-142\">\n\t<td class=\"column-1\">141<\/td><td class=\"column-2\">North Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 26,670 meters of 3\/4-inch pipe with a thickness of 0.113 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-143\">\n\t<td class=\"column-1\">142<\/td><td class=\"column-2\">North Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 57,167 meters of 16-inch pipe with thicknesses of 0.250, 0.281, and 0.344 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-144\">\n\t<td class=\"column-1\">143<\/td><td class=\"column-2\">North Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 50,000 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-145\">\n\t<td class=\"column-1\">144<\/td><td class=\"column-2\">North Khorasan Province Gas Company<\/td><td class=\"column-3\">Purchase of 4,200 meters of 8 and 10-inch pipes with thicknesses of 0.188 and 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-146\">\n\t<td class=\"column-1\">145<\/td><td class=\"column-2\">Khuzestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 150,000 meters of 3\/4-inch pipe with a thickness of 0.113 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-147\">\n\t<td class=\"column-1\">146<\/td><td class=\"column-2\">Khuzestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 105,000 meters of 3\/4-inch pipe with a thickness of 0.113 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-148\">\n\t<td class=\"column-1\">147<\/td><td class=\"column-2\">Khuzestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 42,000 meters of 2 and 4-inch pipes with thicknesses of 0.154 and 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-149\">\n\t<td class=\"column-1\">148<\/td><td class=\"column-2\">Khuzestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 8,000 meters of 6 and 8-inch pipes with thicknesses of 0.172 and 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-150\">\n\t<td class=\"column-1\">149<\/td><td class=\"column-2\">Khuzestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 9 butterfly and welded ball valves in 8 and 12-inch sizes<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-151\">\n\t<td class=\"column-1\">150<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,012 meters of 10-inch pipe with a thickness of 0.279 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-152\">\n\t<td class=\"column-1\">151<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 6,700 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-153\">\n\t<td class=\"column-1\">152<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 68,750 meters of 3\/4, 4, and 6-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-154\">\n\t<td class=\"column-1\">153<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 7,000 meters of 10 and 12-inch pipes with thicknesses of 0.219 and 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-155\">\n\t<td class=\"column-1\">154<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 4,008 meters of 8-inch pipe with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-156\">\n\t<td class=\"column-1\">155<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 10,848 meters of 2, 4, and 6-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-157\">\n\t<td class=\"column-1\">156<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 46,000 meters of 3\/4, 2, 4, and 6-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-158\">\n\t<td class=\"column-1\">157<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 52,500 meters of 3\/4, 2, and 4-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-159\">\n\t<td class=\"column-1\">158<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 47,400 meters of 10 and 12-inch pipes with a thickness of 0.219 and 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-160\">\n\t<td class=\"column-1\">159<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 20,000 meters of 10-inch pipes with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-161\">\n\t<td class=\"column-1\">160<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 19,559 meters of 12 and 16-inch pipes in four different thicknesses<\/td><td class=\"column-4\">API 5L GR B , API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-162\">\n\t<td class=\"column-1\">161<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 40,000 meters of 6 and 8-inch pipes with a thickness of 0.172 and 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-163\">\n\t<td class=\"column-1\">162<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 1-inch pipes with a thickness of 0.133 inches (Contractor of Farayand Tose'e Pad)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-164\">\n\t<td class=\"column-1\">163<\/td><td class=\"column-2\">Zanjan Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,229 meters of 10 and 12-inch pipes with a thickness of 0.219 and 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-165\">\n\t<td class=\"column-1\">164<\/td><td class=\"column-2\">Semnan Province Gas Company<\/td><td class=\"column-3\">Purchase of 60,820 meters of 6, 8, and 10-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-166\">\n\t<td class=\"column-1\">165<\/td><td class=\"column-2\">Sistan and Baluchestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 23,150 meters of 6 and 10-inch pipes with a thickness of 0.219 inches (Contractor of Saze Gaz_e Toos)<\/td><td class=\"column-4\">API 5L GR B , API 5L<br \/>\r\nGR X42<\/td>\n<\/tr>\n<tr class=\"row-167\">\n\t<td class=\"column-1\">166<\/td><td class=\"column-2\">Sistan and Baluchestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 20,304 meters of 6, 10, 12, 16, and 20-inch pipes (Contractor of Mash'al Gostar Sepahan)<\/td><td class=\"column-4\">API 5L GR B,API 5L GR X52, API 5L<br \/>\r\nGR X60<\/td>\n<\/tr>\n<tr class=\"row-168\">\n\t<td class=\"column-1\">167<\/td><td class=\"column-2\">Sistan and Baluchestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 6,180 meters of 2, 4, 6, and 8-inch grade B pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-169\">\n\t<td class=\"column-1\">168<\/td><td class=\"column-2\">Fars Province Gas Company<\/td><td class=\"column-3\">Purchase of 4,000 meters of 4-inch pipes with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-170\">\n\t<td class=\"column-1\">169<\/td><td class=\"column-2\">Fars Province Gas Company<\/td><td class=\"column-3\">Purchase of 7,000 meters of 6 and 8-inch pipes with a thickness of 0.172 and 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-171\">\n\t<td class=\"column-1\">170<\/td><td class=\"column-2\">Fars Province Gas Company<\/td><td class=\"column-3\">Purchase of 134,890 meters of 3\/4-inch pipes with a thickness of 0.113 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-172\">\n\t<td class=\"column-1\">171<\/td><td class=\"column-2\">Fars Province Gas Company<\/td><td class=\"column-3\">Purchase of 8,000 meters of 10-inch pipes with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-173\">\n\t<td class=\"column-1\">172<\/td><td class=\"column-2\">Fars Province Gas Company<\/td><td class=\"column-3\">Purchase of 6,000 meters of 16-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-174\">\n\t<td class=\"column-1\">173<\/td><td class=\"column-2\">Qazvin Province Gas Company<\/td><td class=\"column-3\">Purchase of 4 and 6-inch pipes<\/td><td class=\"column-4\">_<\/td>\n<\/tr>\n<tr class=\"row-175\">\n\t<td class=\"column-1\">174<\/td><td class=\"column-2\">Qom Province Gas Company<\/td><td class=\"column-3\">Purchase of 4,824 meters of 4, 6, and 8-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-176\">\n\t<td class=\"column-1\">175<\/td><td class=\"column-2\">Qom Province Gas Company<\/td><td class=\"column-3\">Purchase of 4,507 meters of 24-inch pipes with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-177\">\n\t<td class=\"column-1\">176<\/td><td class=\"column-2\">Qom Province Gas Company<\/td><td class=\"column-3\">Purchase of 12,703 meters of 24-inch pipes with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-178\">\n\t<td class=\"column-1\">177<\/td><td class=\"column-2\">Qom Province Gas Company<\/td><td class=\"column-3\">Purchase of 7,800 meters of 4 and 6-inch pipes with a thickness of 0.172 inches (Contractor of Ghahan Qom)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-179\">\n\t<td class=\"column-1\">178<\/td><td class=\"column-2\">Qom Province Gas Company<\/td><td class=\"column-3\">Purchase of 22,680 meters of 10-inch pipes with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-180\">\n\t<td class=\"column-1\">179<\/td><td class=\"column-2\">Kurdistan Province Gas Company<\/td><td class=\"column-3\">Purchase of 41,149 meters of 2, 4, and 6-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-181\">\n\t<td class=\"column-1\">180<\/td><td class=\"column-2\">Kurdistan Province Gas Company<\/td><td class=\"column-3\">Purchase of 8,796 meters of 10, 16, and 20-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-182\">\n\t<td class=\"column-1\">181<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 31,500 meters of 10-inch steel pipes with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-183\">\n\t<td class=\"column-1\">182<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 8,004 meters of 12-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-184\">\n\t<td class=\"column-1\">183<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 19,008 meters of 16-inch pipes with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-185\">\n\t<td class=\"column-1\">184<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 14,004 meters of 20-inch pipes with a thickness of 0.375 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-186\">\n\t<td class=\"column-1\">185<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 87,000 meters of 8-inch pipes with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-187\">\n\t<td class=\"column-1\">186<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 39,708 meters of 4 and 6-inch pipes with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-188\">\n\t<td class=\"column-1\">187<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 11,244 meters of 16-inch pipes with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-189\">\n\t<td class=\"column-1\">188<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 27,000 meters of 8-inch pipes with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-190\">\n\t<td class=\"column-1\">189<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 272,500 meters of 10 and 12-inch pipes with a thickness of 0.219 and 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-191\">\n\t<td class=\"column-1\">190<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 12,354 meters of 16-inch pipes with a thickness of 0.250 and 0.312 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-192\">\n\t<td class=\"column-1\">191<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 28,758 meters of 12-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-193\">\n\t<td class=\"column-1\">192<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 38,760 meters of 10-inch steel pipes with a thickness of 0.219 inches (Contractor of Sial Fan Kalar)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-194\">\n\t<td class=\"column-1\">193<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 2,028 meters of 12-inch pipes with a thickness of 0.250 inches (Contractor of Pars Omid Karmania)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-195\">\n\t<td class=\"column-1\">194<\/td><td class=\"column-2\">Kerman Province Gas Company<\/td><td class=\"column-3\">Purchase of 1,032 meters of 10-inch steel pipes with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-196\">\n\t<td class=\"column-1\">195<\/td><td class=\"column-2\">Kermanshah Province Gas Company<\/td><td class=\"column-3\">Purchase of 6,000 meters of 12-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-197\">\n\t<td class=\"column-1\">196<\/td><td class=\"column-2\">Kermanshah Province Gas Company<\/td><td class=\"column-3\">Purchase of 14,400 meters of 12-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-198\">\n\t<td class=\"column-1\">197<\/td><td class=\"column-2\">Kermanshah Province Gas Company<\/td><td class=\"column-3\">Purchase of 15,000 meters of 8-inch pipes with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-199\">\n\t<td class=\"column-1\">198<\/td><td class=\"column-2\">Kermanshah Province Gas Company<\/td><td class=\"column-3\">Purchase of 4,800 meters of 12-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-200\">\n\t<td class=\"column-1\">199<\/td><td class=\"column-2\">Kermanshah Province Gas Company<\/td><td class=\"column-3\">Purchase of 4,200 meters of 8 and 10-inch pipes with a thickness of 0.280 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-201\">\n\t<td class=\"column-1\">200<\/td><td class=\"column-2\">Kohgiluyeh and Boyer-Ahmad Province Gas Company<\/td><td class=\"column-3\">Purchase of 47,000 meters of 10-inch steel pipes with a thickness of 0.250 and 0.265 inches<\/td><td class=\"column-4\">API 5L GR B , API 5L<br \/>\r\nGR X42<\/td>\n<\/tr>\n<tr class=\"row-202\">\n\t<td class=\"column-1\">201<\/td><td class=\"column-2\">Golestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 108,000 meters of 2, 4, 6, and 8-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-203\">\n\t<td class=\"column-1\">202<\/td><td class=\"column-2\">Golestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 103,600 meters of 2, 4, 6, 8, 10, and 16-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-204\">\n\t<td class=\"column-1\">203<\/td><td class=\"column-2\">Golestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 28,000 meters of 10-inch steel pipes with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-205\">\n\t<td class=\"column-1\">204<\/td><td class=\"column-2\">Golestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 7,500 meters of 16-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-206\">\n\t<td class=\"column-1\">205<\/td><td class=\"column-2\">Golestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 5,000 meters of 12-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-207\">\n\t<td class=\"column-1\">206<\/td><td class=\"column-2\">Golestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 13,000 meters of 10-inch steel pipes with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-208\">\n\t<td class=\"column-1\">207<\/td><td class=\"column-2\">Golestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 105,000 meters of 6, 8, and 10-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-209\">\n\t<td class=\"column-1\">208<\/td><td class=\"column-2\">Golestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 27,000 meters of 10-inch steel pipes with a thickness of 0.219 inches (Contracto of: Sadeghat Pisheh Tabarestan)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-210\">\n\t<td class=\"column-1\">209<\/td><td class=\"column-2\">Golestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 2,160 meters of 6-inch pipes with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-211\">\n\t<td class=\"column-1\">210<\/td><td class=\"column-2\">Gilan Province Gas Company<\/td><td class=\"column-3\">Purchase of 14,160 meters of 10-inch steel pipes with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-212\">\n\t<td class=\"column-1\">211<\/td><td class=\"column-2\">Gilan Province Gas Company<\/td><td class=\"column-3\">Purchase of 16,800 meters of 8-inch pipes with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-213\">\n\t<td class=\"column-1\">212<\/td><td class=\"column-2\">Gilan Province Gas Company<\/td><td class=\"column-3\">Purchase of 11,040 meters of 6 and 8-inch pipes with a thickness of 0.172 and 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-214\">\n\t<td class=\"column-1\">213<\/td><td class=\"column-2\">Gilan Province Gas Company<\/td><td class=\"column-3\">Purchase of 57,300 meters of 16-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-215\">\n\t<td class=\"column-1\">214<\/td><td class=\"column-2\">Gilan Province Gas Company<\/td><td class=\"column-3\">Purchase of 22,092 meters of 8, 10, and 12-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-216\">\n\t<td class=\"column-1\">215<\/td><td class=\"column-2\">Gilan Province Gas Company<\/td><td class=\"column-3\">Purchase of 48,500 meters of 16 and 20-inch pipes with a thickness of 0.250 inches (Contractor of Yazdan Gostar Isfahan)<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-217\">\n\t<td class=\"column-1\">216<\/td><td class=\"column-2\">Gilan Province Gas Company<\/td><td class=\"column-3\">Purchase of 15,521 meters of 16 and 20-inch pipes with a thickness of 0.250 inches (Contractor of Eris Oxin)<\/td><td class=\"column-4\">API 5L GR B,API 5L<br \/>\r\nGR X52<\/td>\n<\/tr>\n<tr class=\"row-218\">\n\t<td class=\"column-1\">217<\/td><td class=\"column-2\">Gilan Province Gas Company<\/td><td class=\"column-3\">Purchase of 6,000 meters of 10-inch pipes with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-219\">\n\t<td class=\"column-1\">218<\/td><td class=\"column-2\">Lorestan Province Gas Company<\/td><td class=\"column-3\">Purchase of 6-inch pipes<\/td><td class=\"column-4\">_<\/td>\n<\/tr>\n<tr class=\"row-220\">\n\t<td class=\"column-1\">219<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 49,704 meters of 6, 8, and 10-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-221\">\n\t<td class=\"column-1\">220<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 13,796 meters of 6, 8, and 10-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-222\">\n\t<td class=\"column-1\">221<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 20,312 meters of 16-inch pipes with a thickness of 0.281 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-223\">\n\t<td class=\"column-1\">222<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 6,000 meters of 10 and 12-inch pipes with a thickness of 0.219 and 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-224\">\n\t<td class=\"column-1\">223<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 11,772 meters of 6 and 8-inch pipes with a thickness of 0.172 and 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-225\">\n\t<td class=\"column-1\">224<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 7,536 meters of 12-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-226\">\n\t<td class=\"column-1\">225<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 11,016 meters of 10-inch steel pipes with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-227\">\n\t<td class=\"column-1\">226<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 11,000 meters of 10 and 12-inch pipes with a thickness of 0.219 and 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-228\">\n\t<td class=\"column-1\">227<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 10,000 meters of 16-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-229\">\n\t<td class=\"column-1\">228<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 36,000 meters of 16-inch pipes with a thickness of 0.250 inches (Contractor of Baliay Shomal)<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-230\">\n\t<td class=\"column-1\">229<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,888 meters of 12-inch pipes with a thickness of 0.250 inches (Contractor of Baliay Shomal)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-231\">\n\t<td class=\"column-1\">230<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 1,350 meters of 8-inch pipes with a thickness of 0.188 inches  (Contractor of Himeh Tash Behshahr)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-232\">\n\t<td class=\"column-1\">231<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,000 meters of 16-inch pipes with a thickness of 0.250 inches (Contractor of Nial Sazeh)<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-233\">\n\t<td class=\"column-1\">232<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 6,000 meters of 16-inch pipes with a thickness of 0.250 inches (Contractor of Zeidab Shomal)<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-234\">\n\t<td class=\"column-1\">233<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 8,000 meters of 16-inch pipes with a thickness of 0.281 inches (Contractor of Ashkan Tejarat Sari)<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-235\">\n\t<td class=\"column-1\">234<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 8,500 meters of 20-inch pipes with a thickness of 0.312 inches (Contractor of Ashkan Tejarat Sari)<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-236\">\n\t<td class=\"column-1\">235<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 2,269 meters of 12-inch pipes with a thickness of 0.250 inches (Contractor of Mana Energy Parsian)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-237\">\n\t<td class=\"column-1\">236<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 2,781 meters of 12-inch pipes with a thickness of 0.250 inches (Contractor of Rakhman)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-238\">\n\t<td class=\"column-1\">237<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,732 meters of 6 and 8-inch pipes (Contractor of Rakhman)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-239\">\n\t<td class=\"column-1\">238<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 2,004 meters of 10-inch pipes with a thickness of 0.219 inches (Contractor of Rakhman)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-240\">\n\t<td class=\"column-1\">239<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 2,808 meters of 8-inch pipes with a thickness of 0.188 inches (Contractor of Rakhman)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-241\">\n\t<td class=\"column-1\">240<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 6,097 meters of 16-inch pipes with a thickness of 0.250 inches (Contractor of Fanavari Poya-ye Khazar)<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-242\">\n\t<td class=\"column-1\">241<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 5,004 meters of 6-inch pipes with a thickness of 0.172 inches (Contractor of Sedaghat Pisheh Tabarestan)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-243\">\n\t<td class=\"column-1\">242<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,212 meters of 16-inch pipes (Contractor of Sedaghat Pisheh Tabarestan)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-244\">\n\t<td class=\"column-1\">243<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 9,504 meters of 8-inch pipes with a thickness of 0.188 inches (Contractor of Sedaghat Pisheh Tabarestan)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-245\">\n\t<td class=\"column-1\">244<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,955 meters of 16-inch pipes with a thickness of 0.250 inches (Contractor of Balar Nasb Rasht)<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-246\">\n\t<td class=\"column-1\">245<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 1,500 meters of 12-inch pipes with a thickness of 0.250 inches (Contractor of Balar Nasb Rasht)<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-247\">\n\t<td class=\"column-1\">246<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 3,468 meters of 6-inch pipes with a thickness of 0.172 inches (Contractor of Omid Sazeh Karan Shomal)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-248\">\n\t<td class=\"column-1\">247<\/td><td class=\"column-2\">Mazandaran Province Gas Company<\/td><td class=\"column-3\">Purchase of 2,628 meters of 2 and 4-inch pipes (Contractor of Shayesteh Pishgam Sanat)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-249\">\n\t<td class=\"column-1\">248<\/td><td class=\"column-2\">Markazi Province Gas Company<\/td><td class=\"column-3\">Purchase of 7,000 meters of 8-inch pipes with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-250\">\n\t<td class=\"column-1\">249<\/td><td class=\"column-2\">Markazi Province Gas Company<\/td><td class=\"column-3\">Purchase of 4,500 meters of 16-inch pipes with a thickness of 0.312 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-251\">\n\t<td class=\"column-1\">250<\/td><td class=\"column-2\">Hamedan Province Gas Company<\/td><td class=\"column-3\">Purchase of 2,856 meters of 10-inch pipes with a thickness of 0.219 inches (Contractor of Hegmatan Hirbod Alvand)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-252\">\n\t<td class=\"column-1\">251<\/td><td class=\"column-2\">Hamedan Province Gas Company<\/td><td class=\"column-3\">Purchase of 37,000 meters of \u00be, 2, 4, and 8-inch pipes in various thicknesses<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-253\">\n\t<td class=\"column-1\">252<\/td><td class=\"column-2\">Hormozgan Province Gas Company<\/td><td class=\"column-3\">Purchase of 2,256 meters of 30-inch pipes with a thickness of 0.688 inches (Contractor: Sial Fan Klar)<\/td><td class=\"column-4\">API 5L GR X60<\/td>\n<\/tr>\n<tr class=\"row-254\">\n\t<td class=\"column-1\">253<\/td><td class=\"column-2\">Yazd Province Gas Company<\/td><td class=\"column-3\">Purchase of 34,500 meters of 24-inch pipes with a thickness of 0.375 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-255\">\n\t<td class=\"column-1\">254<\/td><td class=\"column-2\">Yazd Province Gas Company<\/td><td class=\"column-3\">Purchase of 10,500 meters of 4-inch pipes with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-256\">\n\t<td class=\"column-1\">255<\/td><td class=\"column-2\">Yazd Province Gas Company<\/td><td class=\"column-3\">Purchase of 21,000 meters of \u00be, 2, and 6-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-257\">\n\t<td class=\"column-1\">256<\/td><td class=\"column-2\">Yazd Province Gas Company<\/td><td class=\"column-3\">Purchase of 45,000 meters of 8-inch pipes with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-258\">\n\t<td class=\"column-1\">257<\/td><td class=\"column-2\">Yazd Province Gas Company<\/td><td class=\"column-3\">Purchase of 4,500 meters of 10 and 12-inch pipes with a thickness of 0.219 and 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-259\">\n\t<td class=\"column-1\">258<\/td><td class=\"column-2\">Yazd Province Gas Company<\/td><td class=\"column-3\">Purchase of 80,000 meters of 4 and 6-inch pipes with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-260\">\n\t<td class=\"column-1\">259<\/td><td class=\"column-2\">Yazd Province Gas Company<\/td><td class=\"column-3\">Purchase of 11,500 meters of 20-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR X60<\/td>\n<\/tr>\n<tr class=\"row-261\">\n\t<td class=\"column-1\">260<\/td><td class=\"column-2\">Yazd Province Gas Company<\/td><td class=\"column-3\">Purchase of 11,519 meters of 16-inch pipes with a thickness of 0.250 inches (Contractor of Rejal Sanat Sepahan)<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-262\">\n\t<td class=\"column-1\">261<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 1,502 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-263\">\n\t<td class=\"column-1\">262<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 76,650 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-264\">\n\t<td class=\"column-1\">263<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 81,650 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-265\">\n\t<td class=\"column-1\">264<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 35,420 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-266\">\n\t<td class=\"column-1\">265<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 12,000 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-267\">\n\t<td class=\"column-1\">266<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 28,000 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-268\">\n\t<td class=\"column-1\">267<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 19,200 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-269\">\n\t<td class=\"column-1\">268<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 21,748 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-270\">\n\t<td class=\"column-1\">269<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 97,100 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-271\">\n\t<td class=\"column-1\">270<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 15,500 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-272\">\n\t<td class=\"column-1\">271<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 57,520 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-273\">\n\t<td class=\"column-1\">272<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 284,472 kilograms of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-274\">\n\t<td class=\"column-1\">273<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 432,424 kilograms of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-275\">\n\t<td class=\"column-1\">274<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 1,505,130 kilograms of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-276\">\n\t<td class=\"column-1\">275<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 223,100 kilograms of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-277\">\n\t<td class=\"column-1\">276<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 882,400 kilograms of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-278\">\n\t<td class=\"column-1\">277<\/td><td class=\"column-2\">Khuzestan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 802,800 kilograms of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-279\">\n\t<td class=\"column-1\">278<\/td><td class=\"column-2\">Ilam Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 18,220 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-280\">\n\t<td class=\"column-1\">279<\/td><td class=\"column-2\">Chaharmahal and Bakhtiari Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 5,796 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-281\">\n\t<td class=\"column-1\">280<\/td><td class=\"column-2\">Chaharmahal and Bakhtiari Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of 8,400 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-282\">\n\t<td class=\"column-1\">281<\/td><td class=\"column-2\">Hormozgan Province Rural Water and Wastewater Company<\/td><td class=\"column-3\">Purchase of steel pipes in various sizes<\/td><td class=\"column-4\">_<\/td>\n<\/tr>\n<tr class=\"row-283\">\n\t<td class=\"column-1\">282<\/td><td class=\"column-2\">Iran Communication Company<\/td><td class=\"column-3\">Purchase of 3,504 meters of 8, 10, and 16-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-284\">\n\t<td class=\"column-1\">283<\/td><td class=\"column-2\">Gol Gohar Mining and Industrial Company<\/td><td class=\"column-3\">Purchase of 98,561 meters of 24-inch pipes with a thickness of 0.406, 0.469, and 0.562 inches<\/td><td class=\"column-4\">API 5L GR X60<\/td>\n<\/tr>\n<tr class=\"row-285\">\n\t<td class=\"column-1\">284<\/td><td class=\"column-2\">Gol Gohar Mining and Industrial Company<\/td><td class=\"column-3\">Purchase of 11,280 meters of 36-inch spiral pipes with a thickness of 11 millimeters<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-286\">\n\t<td class=\"column-1\">285<\/td><td class=\"column-2\">Baft Steel Revival Company (Employer: Kerman Province Gas Company)<\/td><td class=\"column-3\">Purchase of 64,000 meters of 12-inch pipes with thicknesses of 0.219, 0.250, 0.312, and 0.375 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-287\">\n\t<td class=\"column-1\">286<\/td><td class=\"column-2\">Iranian Oil Terminals Company<\/td><td class=\"column-3\">Purchase of 2,105 meters of 20-inch pipes with a thickness of 0.500 inches, Grade B (Contractor: Barbad Fan Avar)<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-288\">\n\t<td class=\"column-1\">287<\/td><td class=\"column-2\">Iranian Oil Terminals Company<\/td><td class=\"column-3\">Purchase of 229 meters of 16-inch pipes with a thickness of 0.500 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-289\">\n\t<td class=\"column-1\">288<\/td><td class=\"column-2\">Balar nasb Rasht Company<\/td><td class=\"column-3\">Purchase of 4,613 meters of 16-inch pipes with a thickness of 0.250 inches (Contractor: Garnu Consulting Engineers)<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-290\">\n\t<td class=\"column-1\">289<\/td><td class=\"column-2\">Balar nasb Rasht Company<\/td><td class=\"column-3\">Purchase of 1,500 meters of 12-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-291\">\n\t<td class=\"column-1\">290<\/td><td class=\"column-2\">Tose'e Energy Omran Ideh Company<\/td><td class=\"column-3\">Purchase of 2,751 meters of seamless 10 and 12-inch NACE pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-292\">\n\t<td class=\"column-1\">291<\/td><td class=\"column-2\">Hemmat Karan Engineering Company<\/td><td class=\"column-3\">Purchase of 5,500 meters of 16-inch pipe with a thickness of 0.375 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-293\">\n\t<td class=\"column-1\">292<\/td><td class=\"column-2\">Gostaresh Khat and Network Engineering Company<\/td><td class=\"column-3\">Purchase of 10,380 meters of 6 and 8-inch pipes with thicknesses of 0.172 and 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-294\">\n\t<td class=\"column-1\">293<\/td><td class=\"column-2\">Bukhara Technological Engineering Company<\/td><td class=\"column-3\">Purchase of 2,286 meters of seamless pipe<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-295\">\n\t<td class=\"column-1\">294<\/td><td class=\"column-2\">Shahid Rajaei Power Management Company<\/td><td class=\"column-3\">Purchase of Corten A sheet for the steam power plant duct<\/td><td class=\"column-4\">_<\/td>\n<\/tr>\n<tr class=\"row-296\">\n\t<td class=\"column-1\">295<\/td><td class=\"column-2\">Shiva Mashal Sedaghat Technical Engineering Company<\/td><td class=\"column-3\">Purchase of 3,372 meters of 4, 6, 12, 16, 20, and 24-inch pipes<\/td><td class=\"column-4\">API 5L GR B,API 5L GR X42, API 5L<br \/>\r\nGR X60<\/td>\n<\/tr>\n<tr class=\"row-297\">\n\t<td class=\"column-1\">296<\/td><td class=\"column-2\">Shiva Mashal Sedaghat Technical Engineering Company<\/td><td class=\"column-3\">Purchase of 21,084 meters of 4, 6, 8, and 10-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-298\">\n\t<td class=\"column-1\">297<\/td><td class=\"column-2\">Pabdana Coal Processing Company<\/td><td class=\"column-3\">Purchase of pipes and fittings<\/td><td class=\"column-4\">_<\/td>\n<\/tr>\n<tr class=\"row-299\">\n\t<td class=\"column-1\">298<\/td><td class=\"column-2\">Pardis New Town Development Company<\/td><td class=\"column-3\">Purchase of 5,016 meters of 48-inch pipes in various thicknesses<\/td><td class=\"column-4\">API 5L GR X65,API<br \/>\r\n5L GR X70<\/td>\n<\/tr>\n<tr class=\"row-300\">\n\t<td class=\"column-1\">299<\/td><td class=\"column-2\">Dimiko Iranian Engineering and Development Company<\/td><td class=\"column-3\">Purchase of pipe<\/td><td class=\"column-4\">_<\/td>\n<\/tr>\n<tr class=\"row-301\">\n\t<td class=\"column-1\">300<\/td><td class=\"column-2\">Oil Building Design Company<\/td><td class=\"column-3\">Purchase of polyethylene pipe coating<\/td><td class=\"column-4\">_<\/td>\n<\/tr>\n<tr class=\"row-302\">\n\t<td class=\"column-1\">301<\/td><td class=\"column-2\">Oil Building Design Company<\/td><td class=\"column-3\">Purchase of 14 pieces of carbon steel welded pipes<\/td><td class=\"column-4\">_<\/td>\n<\/tr>\n<tr class=\"row-303\">\n\t<td class=\"column-1\">302<\/td><td class=\"column-2\">Qom Province Industrial Estates Company<\/td><td class=\"column-3\">Purchase of 6,662 meters of 10 and 16-inch pipes with thicknesses of 0.219 and 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-304\">\n\t<td class=\"column-1\">303<\/td><td class=\"column-2\">Heyward Construction and Road Company<\/td><td class=\"column-3\">Purchase of 9 pieces of steel pipes in various sizes<\/td><td class=\"column-4\">_<\/td>\n<\/tr>\n<tr class=\"row-305\">\n\t<td class=\"column-1\">304<\/td><td class=\"column-2\">Keyvan Kosha Construction and Installation Company<\/td><td class=\"column-3\">Purchase of 9,444 meters of 4 and 6-inch pipes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-306\">\n\t<td class=\"column-1\">305<\/td><td class=\"column-2\">Keyvan Kosha Construction and Installation Company<\/td><td class=\"column-3\">Purchase of 3,300 meters of 20-inch pipes with a thickness of 14\/30 mm with coating<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-307\">\n\t<td class=\"column-1\">306<\/td><td class=\"column-2\">Keyvan Kosha Construction and Installation Company<\/td><td class=\"column-3\">Purchase of 2,089 meters of 12 and 24-inch pipes<\/td><td class=\"column-4\">_<\/td>\n<\/tr>\n<tr class=\"row-308\">\n\t<td class=\"column-1\">307<\/td><td class=\"column-2\">Keyvan Kosha Construction and Installation Company<\/td><td class=\"column-3\">Purchase of 273 meters of 24-inch pipes with a thickness of 0.375 inches<\/td><td class=\"column-4\">API 5L GR X60<\/td>\n<\/tr>\n<tr class=\"row-309\">\n\t<td class=\"column-1\">308<\/td><td class=\"column-2\">Keyvan Kosha Construction and Installation Company<\/td><td class=\"column-3\">Purchase of 2,448 meters of 8-inch pipes with a thickness of 14\/7 mm<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-310\">\n\t<td class=\"column-1\">309<\/td><td class=\"column-2\">Eastern Iran Infrastructure Supply and Development Company<\/td><td class=\"column-3\">Purchase of 1,218 meters of 16-inch pipes with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-311\">\n\t<td class=\"column-1\">310<\/td><td class=\"column-2\">Asalem Cooperative Development Company<\/td><td class=\"column-3\">Purchase of 76,944 meters of 4, 6, and 10-inch pipes<\/td><td class=\"column-4\">_<\/td>\n<\/tr>\n<tr class=\"row-312\">\n\t<td class=\"column-1\">311<\/td><td class=\"column-2\">Poushesh Karan Akhgar Company<\/td><td class=\"column-3\">Purchase of 3,996 meters of 2-inch pipe with a thickness of 0.154 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-313\">\n\t<td class=\"column-1\">312<\/td><td class=\"column-2\">Poushesh Karan Akhgar Company<\/td><td class=\"column-3\">Purchase of 4,128 meters of 6-inch pipe with a thickness of 0.172 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-314\">\n\t<td class=\"column-1\">313<\/td><td class=\"column-2\">Poushesh Karan Akhgar Company<\/td><td class=\"column-3\">Purchase of 10,800 meters of 12-inch pipe with a thickness of 0.250 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-315\">\n\t<td class=\"column-1\">314<\/td><td class=\"column-2\">Ra'dan Niroo Zagros Company<\/td><td class=\"column-3\">Purchase of 1,500 meters of seamless steel pipe<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-316\">\n\t<td class=\"column-1\">315<\/td><td class=\"column-2\">Hermes Sanat Pasargad Company<\/td><td class=\"column-3\">Purchase of 1,400 meters of 12-inch pipe with a thickness of 0.330 inches<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-317\">\n\t<td class=\"column-1\">316<\/td><td class=\"column-2\">Sial Fan Color Company<\/td><td class=\"column-3\">Purchase of 3,000 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-318\">\n\t<td class=\"column-1\">317<\/td><td class=\"column-2\">Ramand Poya Steel Company<\/td><td class=\"column-3\">Purchase of 2,079 meters of 30-inch pipe with a thickness of 0.375 inches<\/td><td class=\"column-4\">API 5L GR X60<\/td>\n<\/tr>\n<tr class=\"row-319\">\n\t<td class=\"column-1\">318<\/td><td class=\"column-2\">Ramand Poya Steel Company<\/td><td class=\"column-3\">Purchase of 9,767 meters of 12-inch pipe<\/td><td class=\"column-4\">API 5L GR X42<\/td>\n<\/tr>\n<tr class=\"row-320\">\n\t<td class=\"column-1\">319<\/td><td class=\"column-2\">Jondi Shapur Company<\/td><td class=\"column-3\">Purchase of 810 pieces of processing, injection, and storage facilities valves<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-321\">\n\t<td class=\"column-1\">320<\/td><td class=\"column-2\">Jondi Shapur Company<\/td><td class=\"column-3\">Purchase of 709 pieces of manual valves<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-322\">\n\t<td class=\"column-1\">321<\/td><td class=\"column-2\">Jondi Shapur Company<\/td><td class=\"column-3\">Annex one of the contract for the purchase of 1,724 manual valves<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-323\">\n\t<td class=\"column-1\">322<\/td><td class=\"column-2\">Jondi Shapur Company<\/td><td class=\"column-3\">Annex two of the contract for the purchase of 1,724 manual valves<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-324\">\n\t<td class=\"column-1\">323<\/td><td class=\"column-2\">Jondi Shapur Company<\/td><td class=\"column-3\">Purchase of 1,724 manual valves for processing, injection, and gas storage facilities<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-325\">\n\t<td class=\"column-1\">324<\/td><td class=\"column-2\">Jondi Shapur Company<\/td><td class=\"column-3\">Contract for the purchase of 36-inch pipe<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-326\">\n\t<td class=\"column-1\">325<\/td><td class=\"column-2\">Kohgiluyeh and Boyer-Ahmad Province Agricultural Jihad Organization<\/td><td class=\"column-3\">Purchase of 2,425 meters of 10 and 6-inch pipes with an oil-based coating<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-327\">\n\t<td class=\"column-1\">326<\/td><td class=\"column-2\">Kohgiluyeh and Boyer-Ahmad Province Agricultural Jihad Organization<\/td><td class=\"column-3\">Purchase of 20 and 24-inch pipes<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-328\">\n\t<td class=\"column-1\">327<\/td><td class=\"column-2\">Iran Gas Transmission Company<\/td><td class=\"column-3\">Purchase of 2,844 meters of 16-inch pipe with a thickness of 0.406 inches (contractor: Sial Fan Kalr)<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-329\">\n\t<td class=\"column-1\">328<\/td><td class=\"column-2\">Iran Gas Transmission Company<\/td><td class=\"column-3\">Purchase of 1,201 meters of 12-inch pipe with a thickness of 0.344 inches<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-330\">\n\t<td class=\"column-1\">329<\/td><td class=\"column-2\">Behdad Pasargad Mining Company<\/td><td class=\"column-3\">Purchase of 8,748 meters of 10 and 12-inch pipes<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-331\">\n\t<td class=\"column-1\">330<\/td><td class=\"column-2\">Part Barathava Company<\/td><td class=\"column-3\">Purchase of 21,168 meters of 6-inch pipe<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-332\">\n\t<td class=\"column-1\">331<\/td><td class=\"column-2\">Pars Fonon Company<\/td><td class=\"column-3\">Purchase of 18,500 meters of 10-inch pipe with a thickness of 0.219 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-333\">\n\t<td class=\"column-1\">332<\/td><td class=\"column-2\">Isfahan Oil Refining Company<\/td><td class=\"column-3\">Purchase of 1,448 meters of 52-inch pipe with a thickness of 0.375 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-334\">\n\t<td class=\"column-1\">333<\/td><td class=\"column-2\">Tehran Oil Refining Company (Shahid Tondgouyan)<\/td><td class=\"column-3\">Purchase of 9,120 meters of seamless pipe<\/td><td class=\"column-4\">API 5L GR B, P22<\/td>\n<\/tr>\n<tr class=\"row-335\">\n\t<td class=\"column-1\">334<\/td><td class=\"column-2\">Payvald Company<\/td><td class=\"column-3\">Purchase of 348 meters of pipe in various sizes<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-336\">\n\t<td class=\"column-1\">335<\/td><td class=\"column-2\">Petro Iran Kish Company<\/td><td class=\"column-3\">Purchase of 3,216 meters of 16-inch pipe with a thickness of 0.344 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-337\">\n\t<td class=\"column-1\">336<\/td><td class=\"column-2\">Natural Gas Storage Company<\/td><td class=\"column-3\">Purchase of 19,000 meters of seamless pipe<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-338\">\n\t<td class=\"column-1\">337<\/td><td class=\"column-2\">Iran Gas Trading Company<\/td><td class=\"column-3\">Purchase of 7,200 meters of galvanized pipe<\/td><td class=\"column-4\">API 5L ST37<\/td>\n<\/tr>\n<tr class=\"row-339\">\n\t<td class=\"column-1\">338<\/td><td class=\"column-2\">Mahshahr Pipe Coating Production Company<\/td><td class=\"column-3\">Purchase of 200,000 meters of 8-inch pipe with a thickness of 0.188 inches<\/td><td class=\"column-4\">API 5L GR B<\/td>\n<\/tr>\n<tr class=\"row-340\">\n\t<td class=\"column-1\">339<\/td><td class=\"column-2\">Mahshahr Pipe Coating Production Company<\/td><td class=\"column-3\">Purchase of 3-layer polyethylene coating for the external surfaces of 20-inch pipes<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-341\">\n\t<td class=\"column-1\">340<\/td><td class=\"column-2\">Chineh Saz Bihaq Company<\/td><td class=\"column-3\">External surface coating related to the 36-inch SCAFF contract<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-342\">\n\t<td class=\"column-1\">341<\/td><td class=\"column-2\">Chineh Saz Bihaq Company<\/td><td class=\"column-3\">Purchase of 16,000 meters of 6-inch water pipe<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-343\">\n\t<td class=\"column-1\">342<\/td><td class=\"column-2\">Azar Ab Industries Company<\/td><td class=\"column-3\">Purchase of 7,300 meters of 6-inch pipe in various thicknesses<\/td><td class=\"column-4\">API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-344\">\n\t<td class=\"column-1\">343<\/td><td class=\"column-2\">Itook Iran Company<\/td><td class=\"column-3\">Purchase of 5,366 meters of pipes for the Cheshmeh Khush project<\/td><td class=\"column-4\">API 5L GR B,API 5L GR X52<\/td>\n<\/tr>\n<tr class=\"row-345\">\n\t<td class=\"column-1\">344<\/td><td class=\"column-2\">Itook Iran Company<\/td><td class=\"column-3\">Purchase of 748 pieces of mechanical valves (Manual Valves)<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-346\">\n\t<td class=\"column-1\">345<\/td><td class=\"column-2\">Rejin Sanat Company<\/td><td class=\"column-3\">Purchase of mechanical valves<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-347\">\n\t<td class=\"column-1\">346<\/td><td class=\"column-2\">Shahid Hashemi Nejad Gas Refinery (Khangiran)<\/td><td class=\"column-3\">Purchase of flanges, fittings, gaskets<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-348\">\n\t<td class=\"column-1\">347<\/td><td class=\"column-2\">Atmosphere Production Factories Company<\/td><td class=\"column-3\">Purchase of 13,000 amino filters for the old and new phases of the refinery<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<tr class=\"row-349\">\n\t<td class=\"column-1\">348<\/td><td class=\"column-2\"><\/td><td class=\"column-3\">Purchase of 250 tubes made in South Korea<\/td><td class=\"column-4\">-<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-2 from cache -->\n\n\n\n<div class=\"wp-block-buttons is-content-justification-right is-layout-flex wp-container-core-buttons-is-layout-b507c051 wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/petrosadr.com\/en\/wp-content\/uploads\/sites\/2\/2025\/03\/PetroSadr-Resume-1404-tables-only.pdf\">Downoad our Refrence List<\/a><\/div>\n<\/div>\n<\/div>\n\n\n","protected":false},"excerpt":{"rendered":"<p>PetroSadr Company, with its extensive experience in executing numerous projects in the oil, gas, petrochemical, and water sectors, has always been recognized as a reliable partner in the energy industry. Infrastructure Successful projects over the past 20 years in the oil, gas, petrochemical, and water industries: Renewable Energy Now, as we enter the field of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-915","page","type-page","status-publish","hentry"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false},"uagb_author_info":{"display_name":"admin","author_link":"https:\/\/petrosadr.com\/en\/author\/aa\/"},"uagb_comment_info":0,"uagb_excerpt":"PetroSadr Company, with its extensive experience in executing numerous projects in the oil, gas, petrochemical, and water sectors, has always been recognized as a reliable partner in the energy industry. Infrastructure Successful projects over the past 20 years in the oil, gas, petrochemical, and water industries: Renewable Energy Now, as we enter the field of&hellip;","_links":{"self":[{"href":"https:\/\/petrosadr.com\/en\/wp-json\/wp\/v2\/pages\/915","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/petrosadr.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/petrosadr.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/petrosadr.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/petrosadr.com\/en\/wp-json\/wp\/v2\/comments?post=915"}],"version-history":[{"count":3,"href":"https:\/\/petrosadr.com\/en\/wp-json\/wp\/v2\/pages\/915\/revisions"}],"predecessor-version":[{"id":2132,"href":"https:\/\/petrosadr.com\/en\/wp-json\/wp\/v2\/pages\/915\/revisions\/2132"}],"wp:attachment":[{"href":"https:\/\/petrosadr.com\/en\/wp-json\/wp\/v2\/media?parent=915"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}